Factory wholesale Prefabricated Steel Pipe Truss For Airport Terminal Roofing - China University of Mining and Technology Training Stadium – HJZC

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We insist on offering high-quality creation with superior business enterprise concept, honest revenue plus the greatest and fast service. it will bring you not only the high quality solution and huge profit, but essentially the most significant is usually to occupy the endless market for Fire Rated Curtain Wall System, Prefabricated Light Weight/Gauge Steel Roof Truss For Large Building, Space Frame Skylight, If you are interested in any of our products or would like to discuss a custom order, please feel free to contact us.
Factory wholesale Prefabricated Steel Pipe Truss For Airport Terminal Roofing - China University of Mining and Technology Training Stadium – HJZC Detail:

Specificaitons

Item Name

Materials Characteristics

Material Grade

Surface Treatment

Steel Column

H shape,Box,Steel Pipe,Hot tolled sheet

Q235B,Q345B

Paint or Hot dip Galvanized

Steel beam

H shape,Box,Steel Pipe,Hot tolled sheet

Q235B,Q345B

Paint or Hot dip Galvanized

Steel Bracing

Steel Rod,Steel Pipe,Angle Steel

Q235B,Q345B

Paint or Hot dip Galvanized

Steel Purlin

C or Z purlins(Thickness1.8mm~3.0mm)

Q235B,Q345B

Hot dip Galvanized

External Wall panels,Roof panels

Single colorful corrugate steel sheet,sandwich panels with EPS,Rock wool,PU.

Galvanized Steel+Painting

Alu-zin 150g,Fluorocarbon pain

Steel buildings Door

Slidding or Rolling door

Steel or Aluminum sheet

Paint or Hot dip galvanized

Steel buildings Windows

Aluminum alloy-Glass,Aluminum alloy-shutter

T=1.0-2.0mm

Alloy

Skylighting panels

FRP T=1.5mm-1.8mm

Coefficient of thermal expansion:2.2×10-5/cm

Light Tranmitar 85%

Ventilator

Turbine ventilator on a ridge

Steel,Stainless steel ,PC

Paint or Hot dip Galvanized

Gutter

Galvanized steel plate,Stainless steel plate

T=2.0mm

Hot dip galvanized

Downpipe

PVC pipe,color steelpipe Y=0.5mm

Dia110mm

paint

Hight Bolt

Ordinary ,High strength

10.9S,4.8S

Hot dip galvanized,Steel

Ground bolts

Steel RodM24,M27,M30,M33,M39,M42

10.9S

Steel

Our Advantage

1. The industry’s leading plasma slitting machine solves the defects of traditional flame cutting burrs;

2. Brand new high-strength steel plate with the material of certificate from first class steel mill , never use rusted stock;

3. Flexible design of welded H-beam, can process various models, fully save costs, 0 waste;

4. Welded H-beam double-sided for continuous full penetration submerged arc welding, which is as strong as hot-rolled H beam And the design is diversified;

5. The 3D drilling machine drill the web and flange hole in one time, which greatly improves the accuracy of the hole making compared with the magnetic drill;
6. Plasma punching machine, high-speed and accurate complete the hole of the sidde plate and rib plate, and the stamp mark is clearly visible after galvanizing or painting;

7. Our own hot-dip galvanizing zinc pot size 12.5*1.8*1.5m, annual productivity 100,000 tons.

How To Buy

Basic Design Requirements: design Load: (very important)
1. Snow load:
2. Wind load:
3. Seismic magnitude:
4. Middle Column allowed or not:
5. Project location:
6. Length (side wall, m):
7. Width (end wall, m):
8. Wall Height (eave, m):
9. Mezzanine or not? And usage:

Building Purpose: we will recommend the best design for the purpose of the building
A. Warehouse/Storage
B. Factory
C. Agriculture Barn
D. Retail Store
E. Repair/Mechanic Shop
F. Office Space
G. Medical Warehouse
H. Animal Farm (please confirm what kind of animal)

Production Process

Production Process
Production Process2

Package&Transport

Frame Steel Structure: Bundle Packing, Edge Wrapped by fabric Cloth

Purlins & Brace packaged with Bundle

Accessories packaged with Carton Box

Package&Transport


Product detail pictures:

Factory wholesale Prefabricated Steel Pipe Truss For Airport Terminal Roofing - China University of Mining and Technology Training Stadium  – HJZC detail pictures

Factory wholesale Prefabricated Steel Pipe Truss For Airport Terminal Roofing - China University of Mining and Technology Training Stadium  – HJZC detail pictures

Factory wholesale Prefabricated Steel Pipe Truss For Airport Terminal Roofing - China University of Mining and Technology Training Stadium  – HJZC detail pictures

Factory wholesale Prefabricated Steel Pipe Truss For Airport Terminal Roofing - China University of Mining and Technology Training Stadium  – HJZC detail pictures

Factory wholesale Prefabricated Steel Pipe Truss For Airport Terminal Roofing - China University of Mining and Technology Training Stadium  – HJZC detail pictures

Factory wholesale Prefabricated Steel Pipe Truss For Airport Terminal Roofing - China University of Mining and Technology Training Stadium  – HJZC detail pictures


Related Product Guide:

Good quality comes to start with; service is foremost; organization is cooperation" is our enterprise philosophy which is regularly observed and pursued by our firm for Factory wholesale Prefabricated Steel Pipe Truss For Airport Terminal Roofing - China University of Mining and Technology Training Stadium – HJZC, The product will supply to all over the world, such as: Orlando, Switzerland, Malaysia, Our company is working by the operation principle of "integrity-based, cooperation created, people oriented, win-win cooperation". We hope we can have a friendly relationship with businessman from all over the world.
  • A nice supplier in this industry, after a detail and careful discussion, we reached a consensus agreement. Hope that we cooperate smoothly.
    5 Stars By Steven from Manila - 2017.09.22 11:32
    Customer service staff and sales man are very patience and they all good at English, product's arrival is also very timely, a good supplier.
    5 Stars By Evangeline from Hongkong - 2017.04.18 16:45

    Related Products